This project was for a previous customer. We worked with them on two of their other homes, needless to say...we liked them and I guess they liked us too!
The garage here was being pushed in, as you can see in the pictures, approximately 3 1/2" at one point. It was also taking in water. After discussing a plan of attack, we started this project. First, we excavated the foundation and then manipulated the wall back as far as possible. We had to prevent the sheering from reoccurring and stabilize the foundation. While we were at it, we waterproofed the foundation and blocked in a couple of windows.
Our homeowner now has a functioning foundation/garage that can be used as a shop for storage or to park cars.